Showing posts with label Criminal. Show all posts
Showing posts with label Criminal. Show all posts

Monday, October 28, 2013

Gloucester, VA - How To Criminally Rig The System? Page Middle School Stories Continue

Page Middle School was not a total loss until Mr. Kiser and the School Board got done with it.
 
County records obtained under the Freedom of Information Act reflect the Page Middle School building, its contents and property in the open were insured for a total of $13,513,744 at the time of the April 2011 tornado. 

 Belfor USA Group was contracted almost immediately after the tornado to commence recovery and cleanup services at Page.  The Group was paid more than $624,000 for services provided.  Services included testing for lead paint, asbestos and other toxins.  It also included clean-up of debris and placement of security measures including fencing.  Of the $624,000 paid to Belfor, $51,303 was paid out for roof patching and other work to preserve the less damaged portions of Page.  $62,600 was paid out to remove exposed asbestos.  $4,000 was paid out to demolish selected areas of the building. 

 At the end of the insurance negotiation process, the insurance carrier’s settlement offer to fund returning the school to an upgraded and functional state and to repair all outbuildings, lights, fences, the concession stand and bleachers was $8,235,687.  Due to what he said were initial low settlement offers from the insurance carrier which are dated July 6, 2011 and July 14, 2011, Mr. Kiser instructed RRMM Architects to provide another assessment of the damage.  In RRMM’s Assessment and Analysis Packet dated August 4, 2011, they elaborate on their solid knowledge of the building and its general character due to an April 2009 contract with the County to do a study on conversion of Page Middle school into an Administrative Operations Center.  

This professional services contract was extended about a month prior to the tornado.  This makes it clearly evident of the County’s intent to keep the building and property long term.  In their assessment RRMM noted several areas in which they disagreed with the insurance carrier’s assessment.  In all fairness to RRMM, the areas they disagreed with appear to be justified and would have enhanced the safety, quality and durability of the building significantly. RRMM’s final estimate of damages was $9,994,355. That is a difference of $1,758,668 with both estimates being well under the $13,513,744 coverage limit. Because of age it is only reasonable that the utility infrastructure servicing the building would have needed to be upgraded or replaced.   These costs would in no way have been as great as what it will now cost to extend the same type of infrastructure to the Page site on T.C. Walker Road.  The parking and driveway areas would have needed to be upgraded to compliment the rest of the re-construction.  According to recorded minutes of the November 9, 2011 School Board meeting, Mr. Kiser stated it would cost around 2.2 million dollars to build school administration offices on the Page site.  Let’s say RRMM’s estimate turned out to be the correct cost.

  Let’s say the County contributed another $10,000,000 to upgrade the utilities, parking and drive areas and to construct the administration facility.  That would have been a total of $11,758,668 the County would have contributed to opening a fully functional middle school and administration center.  Costs to date reported by the public school system are in the neighborhood of 29 million dollars.  The expected recovery time started at 18 months to 2 years and is now expected to be four years and five months.  There is also an expected one million dollar shortfall for furnishings and technology.  6.4 million dollars of the proceeds for construction are from the sale of Qualified School Construction Bonds which entitle the County to a direct federal subsidy to offset 100% of the interest payments on this loan.  12 million dollars is a loan with interest from the sale of Bonds through the Virginia Public School Authority.  These two loans will cost the tax payers over 20 million dollars. 
 
As part of the recovery process, Mr. Kiser formed an Ad Hoc Committee to seek long term solutions for PageMiddle School.  No evidence has been made available that demonstrates the Committee was provided with the insurance carrier’s assessment and analysis of damage to Page.  A FOIA request for Committee meeting minutes resulted in a reply from the Executive Secretary to the Superintendent Diane Gamache, which states:

 “Please be advised that while I have requested minutes (that neither Dr. Kiser nor I possess) from RRMM.  I have yet to hear from them on this matter.  I am uncertain if they retained such meeting notes once the proposals/recommendations had been accepted/agreed upon by the members of the Committee and then presented to both the School Board and the Board of Supervisors.  As soon as I hear from RRMM I will notify you.”  The third point of RRMM’s fee estimate to facilitate the Ad Hoc committee dated June 30, 2011 states: “RRMM will generally steer and lead the committee meetings, take meeting minutes, provide graphics and other materials necessary for the facilitation and bind the conclusions into a hard copy that can be reproduced and distributed at the discretion of GCPS.”  Virginia law allows study committees to meet without a requirement to take minutes, however RRMM explicitly stated they would take minutes.  These minutes should be considered public record once they were compiled.  These minutes, along with other compiled information should have been obtained by the school system before RRMM received final payment for services.
 
In a FOIA obtained email conversation dated June 15, 2011 from School Board member Ann Burruss to Mr. Kiser, the School Board and others starts out with Ms. Burruss providing an update on the WHRO Committee meeting she attended.  Ms. Burruss then writes: “After speaking to Anita today, I feel that I was in error in not “announcing” that I had spoken to Dr. Kiser about serving on this Ad Hoc committee for Page at the same time it was determined that there would be one, which I believe was at the meeting giving the update on Page.  I am reasonably sure that something can get worked out before any final committee membership is determined by Dr. Kiser, as we did foist upon him the task of deciding the make-up of this body.”  School Board member Starr Belvin then wrote: “Does this mean that the board will now have 3 representatives on the committee (you, Anita and Jean)?”  Mr. Kiser then wrote: “Only two board members can serve on this committee.  Ms. Parker and Dr. Pugh were the only ones to express their interest last night.  If the meetings are open to the public, then anyone can be in the audience.  If the Board wishes to give me further guidance on this matter then time can be set aside next week.  Thank you.”  Once three members demonstrated their interest in serving on the committee the committee meetings should have become open to the public or the School Board should have appointed their representatives at a public meeting.  Mr. Kiser’s third sentence demonstrates efforts to conceal the committee meetings from the public. 

 Concealment of this committee’s deliberations is further evident in the committee’s agenda dated July 18, 2011.  In the first item of the agenda it is written: “Discuss necessity for Confidentiality until recommendations are complete and agreed to by majority.”  Mr. Kiser further demonstrates concealment of the committee’s deliberations in anAugust 04, 2011 email in which he writes to the committee members: “Please consider this information as confidential until it is presented to the School Board.” Mr. Kiser was referring to the results of the committee’s deliberations that were presented to the School Board at the August 9, 2011 regular meeting. 
 
According to the FOIA released emails, Mr. Kiser received 15 emails of interest from teachers, 11 from citizens, 1 from a County Supervisor and 1 from a School Board member.
 
Also provided were conversations between Mr. Kiser and Committee member Mike Hagar, beginning on June 30, 2011 with Mr. Hagar saying, “Dr. Kiser, I received your voicemail request for volunteers to serve on a planning board that will address how best to recover from the destruction of Page Middle School.”  Why did Mr. Kiser personally invite and then select this individual to serve on the Committee?  How many other Committee members did Mr. Kiser plant?
 
Also provided was an email conversation in which Mr. Kiser informs School Principles, Tony Beverage, Dave Daniel and Bryan Hartley that he would need them to attend the committee meetings. Committee members Tony Beverage and Bryan Hartley then inform Mr. Kiser that they would only be able to attend the first two meetings. Mr. Beverage and Mr. Hartley should not have been on the Committee because he could not dedicate the required time and there were other principles who likely could have attended. 
 
Also provided were email conversations between Mr. Kiser and Committee member Jay Napier which begin with Mr. Napier’s request to be on the Committee and reminding Mr. Kiser of them previously playing golf at a Virginia Association of School Superintendents conference and of Mr. Kiser inviting him to the Abingdon Ruritan Club.  For Real??!!
 
Also provided was an email between Committee member Jennifer Latour and Mr. Kiser in which Ms. Latour informs Mr. Kiser that she would be unable to attend the second of three meetings. Mr. Kiser responds: “The second day will probably be a critical day in the committee’s deliberations but Mr. Daniel speaks highly of your involvement.   I am unsure at this point whether the third day will be needed but maybe we could communicate prior to the 27th in order to get you up to speed.  I have a committee of 17 people and something may prevent any of them from attending on a given day. With that said, I look forward to your participation on the 18th and let’s see what will be needed from that point. Take care.”  Ms. Latour should not have been on the Committee because she could not dedicate the required time and there were other citizens who could.  What involvement was Mr. Kiser referring to?
 
Also provided were conversations between Committee member Russell Fletcher and Mr. Kiser.  Mr. Fletcher first attempted to send his submission to the School Board via the School’s website Email the Superintendent option on the school’s website.  This attempt resulted in the same type email none delivery message I received several months later when attempting to email the School Board through the school’s website.  Mr. Fletcher’s email was not received until he spoke with Administrative Associate, Carol Dehoux and resent his email with the error message to her email address on July 7, 2011.  There is no indication of who initiated the call between Mr. Fletcher and Ms. Dehoux.  Mr. Kiser sent email notifications to the persons who had been selected for the Committee on July 5, 2011 and notified Mr. Fletcher of his selection two days later on July 7, 2011.  This was the same day Mr. Fletcher’s email of interest was received by Mr. Kiser. Why was he added at the last minute when there were other applicants who submitted on time and were not selected?    
 
Also provided was an email conversation between Supervisor Buddy Riley and Mr. Kiser which started with Mr. Riley’s request to be on the Committee.  Later in the conversation and after forwarding the email with comments to the Board of Supervisors, Mr. Riley informed Mr. Kiser that he would be representing the Board of Supervisors and that some people were not happy about it.  In a later email conversation Mr. Riley informed Mr. Kiser that he would be unable to attend the 3rd meeting.  Mr. Riley approaching Mr. Kiser about being on the Committee seems inappropriate.  Mr. Riley should not have been on the Committee because he could not dedicate the required time and there were other Board members who could.
 
Also provided was an email conversation between Mr. Kiser and Committee member Kathy Tucker in which Ms. Tucker informs Mr. Kiser that she would only attend the first two meetings.  Ms. Tucker should not have been on the Committee because she could not dedicate the required time and there were other teachers who could.
 
The continual decrease in Gloucester Public Schools student enrollment associated with the nations economic down turn brought about the possibility of having to close a school.  Information received under FOIA demonstrates RRMM Architects was awarded a contract on April 21, 2010 for the purpose of providing possible solutions for the “Repurposing of Page Middle School into a School Administration and Operations Center.  On March 25, 2011 that contract was extended to June 30, 2012.  OnApril 16, 2011 Page Middle School was damaged by a tornado.  On June 6, 2011 a Purchase Order submitted by RRMM was approved by Gloucester County in the amount of $10,000.00 for “emergency work done to support investigative needs of schools to assess damage”. On June 6, 2011 another Purchase Order submitted by RRMM was approved by Gloucester County in the amount of $17,000.00 for “emergency work done to support investigative needs of schools to assess damage”. On June 15, 2011 a Request for Professional Services to “review the potential for reconstructing Page Middle School” was advertised.  On July 7, 2011 another Purchase Order submitted by RRMM was approved by Gloucester County in the amount of $13,545.00 for “schematic design/feasibility study-committee facilitation for Page Middle School options study”. This work included creating rough cost design and construction estimates for committee proposed facilities.  These rough cost estimates included the costs for land acquisitions, land clearing, storm water management, wetlands mitigation, utility infrastructure extensions, highway and road improvements (including traffic signals), facilitating a Schools Superintendent appointed study-committee and presenting the committee’s recommendations and estimated costs to the School Board.  It needs to be noted that every option created by the Committee included signalization of the Route 17 and T.C. Walker Roadintersection even if it required purchasing land. 

 Every option also included the complete demolition of Page. There was no VDOT requirement for a signalized entrance at the old Page school site.  At a School Board meeting on July 12, 2011 Mr. Kiser announced the receipt of eleven proposals in response to the June 15, 2011Request for Professional Services.  On August 9, 2011 Duane Harver, Principle for RRMM, publicly presented information to the Gloucester School Board pertaining the July 7, 2011 study committee facilitation purchase order. By this time RRMM’s involvement in the reconstruction professional services process was extensive.  RRMM was awarded the Professional Services contract on January 10, 2012 RRMM was clearly given an advantage over the other architectural firms who submitted bids in that they were already performing work described in the June 15thRFP before the RFP was advertised and the contract awarded.  Having worked closely with project estimators in the past I contacted several of the bidder’s representatives who spoke freely and expressed the same opinion.  One bidder’s representative suggested their company had considered contesting the contract award, but ultimately decided against it. 
 
Also provided under FOIA was an email conversation between Mr. Kiser and Mr. Harver in which Mr. Harver expresses concerns about being able to participate in theJune 15, 2011 RFP if they commit to facilitating the Committee.  Mr. Harver referenced a previous RFP in which RRMM’s participation was excluded inChesapeake because of their involvement in a study pertaining to the services requested in the RFP.  Mr. Kiser responded that RRMM’s work with the Committee would not preclude them from bidding and that he and Bill Lindsey, CPPO, CPM for the Gloucester Purchasing Office, had already spoken about it.  How could the other responsive architectural firms compete against RRMM in this instance?  This is another of numerous tactics utilized by Mr. Kiser to control and minimize the number of persons involved in the process. 
Enhanced by Zemanta

Thursday, July 25, 2013

Gloucester County Sheriff's Weekly Arrest Report


In the 3500 block of Providence Road
Deputies received on July 16 a report of damaged property at Providence Baptist Church. The damage occurred sometime over the previous two days in which a 2006 Thomas Bus van that was parked in an area within a chain-link fence had a driver's side window broken out. Damage was approximately $300.
In the 2100 block of Perrin Creek Road
A resident reported on July 17 the larceny of diesel fuel that was siphoned from a truck parked at a residence. The theft occurred overnight. The loss was approximately $40.
In the 7700 block of Dutton Road
A resident reported a breaking and entering that occurred between 6:30 a.m. and 3:45 p.m. Forced entry was made to the attached garage walk-through door and a 125 series John Deere tractor was taken with a value exceeding $200.
In the 2400 block of George Washington Memorial Highway
Deputies received on July 17 a report of shoplifting from Walgreen's Pharmacy. Management saw a woman conceal cosmetic items inside her purse and leave the store. The woman was identified and a summons for shoplifting was issued to Karen Leigh Robison, 48, of Fields Landing Road in Hayes. The items could not be resold and were valued at less than $200.
In the 2200 block of York Crossing Drive
Deputies received on July 17 a report of vandalism at York River Crossing Cinema. Three symbols were painted in red on the side of the building. The incident occurred during the evening of July 16. Similar symbols were discovered at the Auction House on Route 17.
In the 7000 block of George Washington Memorial Highway
Deputies received on July 18 a report of the fraudulent removal of property owned by Best Way Rent-to-Own. A customer defaulted on payments and pawned the property, which has a value exceeding $200.
In the 7800 block of Beaver Drive
A resident reported on July 18 that a rear door to a vacant residence had been pried open between July 1 and July 11. There were no items missing from the residence.
In the 7000 block of Hayes Shopping Court
Deputies received a report on July 19 of vandalism to a 1993 Bluebird bus parked at the Boys and Girls Club. Graffiti was spray-painted on the side and a window was damaged sometime overnight. The damage is less than $1,000.
In the 5700 block of Hickory Fork Road
A resident reported on July 14 a past breaking and entering that occurred over the weekend while the owner was out of town. Forced entry was made to the French doors. The only item reported stolen was a 2 1/2 –gallon gas can.
In the 6600 block of Jackson Lane
Deputies received on July 16 a fraud report from the Humane Society. A business credit card had fraudulent online transactions on July 12 for a total of approximately $900.
In the 6600 block of Branch Road
A resident reported on July 19 that her First Advantage Visa card number was used at multiple locations in Georgia between May 21 and July 1. Damages were $285.79.
In the 4200 block of Hickory Fork Road
A resident reported on July 19 a past larceny from a detached garage that occurred between July 10 and July 17 while the homeowner was out of the area. A chain saw and impact wrench were taken, with a combined value less than $200.
In the 6800 block of Village South Drive
A resident reported on July 19 damaged property that occurred overnight when two wires from the battery to a Rouse House scooter were cut.
In the 6500 block of Market Drive
A resident reported on July 19 the unauthorized use of a vehicle. After obtaining warrants, deputies arrested Marcus Edward Butler, 21, of John Clayton Memorial Highway in Gloucester.
In the 5000 block of Aberdeen Creek Road
A two-vehicle accident on July 21 resulted in the arrest of Jeffery Adam Culler, 19, of York River Drive inGloucester Point, on charges of driving after illegally consuming alcohol, driving while intoxicated, with a blood alcohol content of between 0.15 and 0.20, first offense, under age possession of alcohol.
In the 6600 block of Forest Hill Avenue
Deputies received on July 21 at 1:30 a.m. the report of an intoxicated male outside of Hampton Inn who was being disorderly and refusing to go inside. Dennis Doutstou, 41, of Holly Avenue in Gloucester, was arrested on a charge of public intoxication.
In the 7100 block of George Washington Memorial Highway
Deputies received a report on July 21 at 4:20 a.m. of an intoxicated male in the area of Route 17 and Damon's. Kyle Anthony Upton, 18, of Providence Road in Hayes, was arrested on charges of public intoxication and underage possession of alcohol.
In the 6800 block of Allison Lane
A resident reported on July 21 the larceny from a front yard of the residence. An Outer Banks rope hammock valued at $200 was taken sometime overnight.
Enhanced by Zemanta

Wednesday, July 11, 2012

Gloucester VA Crime Locator - See Where Crimes Are Happening In Gloucester, VA

SpotCrime Crime M


Gloucester, VA Links and News 

The above is a live link to SpotCrime, a web site that shows the location of where reported crimes have occurred here in Gloucester, VA.   You can sign up for alerts on the site or just bookmark the site and visit it from time to time for news updates.

  Free MP3 download - Don Ward - Clear Blue Now - Smooth jazz track.  A really light and easy sound.  CLICK HERE for your free copy now.  Read the stories, follow the links get stuff, save money.  GVLN - More useful everyday.


Gloucester, VA Links and News
Enhanced by Zemanta